Home > News > New order: Energy Biomass

NEWS

NEW ORDER: ENERGY BIOMASS

On January 15th, 2007 the BU Energy / Biomass received from Umea Energi AB / Sweden the order for a 110 MWth fluidised bed boiler plant system ECOFLUID® for the biomass heating power plant UMEA DAVA 2.

The scope of supply and services includes the engineering, delivery, installation and commissioning.

Technical Data:
Type of boiler: bubbling fluidised bed
Fuels: Forestry wood, bark, wood chips, peat
Boiler size: 147 t/h, 143 bar, 543°C

The project implement periode for the order until PAC is 26 months.

 
Umea

back to Overview